|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
capacity
(ton)
|
Span
(m)
|
Lift
(m)
|
Main
Hoist
|
Auxiliary
Hoist
|
Traver
-sing
|
Travell
-ing
|
Runway
Rail
(Minmum)
(kg/m)
|
Main
Hoist
|
Auxiliary
Hoist
|
Speed
(m/min)
|
Speed
(m/min)
|
Speed
(m/min)
|
Speed
(m/min)
|
|
3
|
-
|
6
-
14
|
12.5
|
13
|
-
|
40
|
110
|
22
|
15-24
|
90
|
5
|
-
|
6
-
14
|
12.5
|
12
|
-
|
40
|
110
|
22
|
15-24
|
90
|
7.5
|
-
|
8
-
14
|
12.5
|
10
|
-
|
40
|
110
|
22
|
15-24
|
90
|
10
|
-
|
8
-
14
|
12.5
|
8
|
-
|
40
|
110
|
30
|
15-14
|
90
|
15
|
Nil
or
3
|
8-14
|
10
or
15
|
8
|
13
|
40
|
100
|
30
|
15-24
|
80
|
20
|
Nil
or
5
|
10-16
|
10
or
15
|
6
|
12
|
35
|
100
|
30
|
17-26
|
80
|
25
|
5
|
10-16
|
10
or
15
|
6
|
12
|
35
|
100
|
37
|
17-26
|
80
|
30
|
5
|
10-16
|
10
or
15
|
5
|
12
|
35
|
100
|
37
|
17-26
|
80
|
40
|
10
|
10-16
|
10
or
15
|
5
|
8
|
35
|
100
|
50
|
17-26
|
80
|
50
|
10
|
12-18
|
10
or
15
|
4
|
8
|
30
|
90
|
50
|
19-26
|
70
|
60
|
10
|
12-26
|
10
or
15
|
3.2
|
8
|
25
|
65
|
73
|
80
|
20
|
12-26
|
10
or
15
|
2.4
|
6
|
25
|
60
|
73
|
100
|
20
|
12-26
|
10
or
15
|
2.3
|
6
|
20
|
55
|
73
|
¡¡ |
¡¡ |
|
|
|
|
|
|
|
|
|